Sign In | Join Free | My himfr.com
Home > Road Construction Bitumen >

Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement

Handan Jinghao Chemical Co., Ltd
Contact Now
    Buy cheap Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement from wholesalers
     
    Buy cheap Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement from wholesalers
    • Buy cheap Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement from wholesalers
    • Buy cheap Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement from wholesalers
    • Buy cheap Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement from wholesalers
    • Buy cheap Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement from wholesalers

    Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement

    Ask Lasest Price
    Brand Name : Jinghao
    Model Number : bitumen 10#
    Certification : ISO
    Price : FOB Tianjin USD 565-655/MT
    Payment Terms : L/C, T/T
    Supply Ability : 1000MT/Month
    Delivery Time : 5-8days
    • Product Details
    • Company Profile

    Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement

    Petroleum Road Construction Bitumen Misture≤5% For Heavy Traffic Road Pavement

    Asphalt is mainly used for higher waterproof materials, anti-corrosion materials, paint, etc.

    Excellent temperature stability, low temperature embrittlement resistance and durability are its main characteristics.


    10#bitumen

    PropertiesTest resultsTest Method
    Penetration (25, 100g, 5s), 0.1mm12GB/T4509
    solubility %96.5GB/T4508
    Softening Ponit, 96GB/T4507
    Flash Point (Open cup method), 230GB/T267
    proportion1.06GB/T8928

    Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road PavementBlack Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement

    FAQ

    Q: Are you trading company or manufacturer ?

    A: We are factory.

    Q: How long is your delivery time?

    A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

    Q: Do you provide samples ? is it free or extra ?

    A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

    Q: What is your terms of payment ?

    A: Payment1000USD, 100% in advance. Payment1000USD, 30% T/T in advance ,balance before shippment.

    If you have another question, pls feel free to contact us as below:

    Contact

    Contact Person:Jack

    Handan Jinghao Chemical Co., Ltd.

    Room 3003,Unit 3,A Rongfu Center,No 179,Renhe Street,Congtai District, Handan, Hebei, China (Mainland)

    E-mail:dong at hdjh88.com

    Tel:+86-18830894446.

    Skype:live:yuanll871213

    Quality Black Petroleum Road Construction Bitumen Misture ≤ 5% For Heavy Traffic Road Pavement for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Handan Jinghao Chemical Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)